MINING PROJECT FEASIBILITY STUDY – TABLE OF CONTENTS
WBS No.  WBS Description  Scope/Requirements  Preliminaries and Project Management 

      Contract Negotiation and Preparation
      Kick-Off Meeting
      Bi-Weekly Progress Report
      Monthly Progress Reports
TOC Item      
1  Summary & Recommendations
Summary, recommendations and executive
summary for standalone reading.
1.1  Executive Summary   
1.2  Recommendations   
2  Introduction
Sets out relevant factual known information
to establish a context for the study.
2.1  Introduction of Meridian Minerals   
2.2  Introduction of Lennard Shelf mines history   
2.3
Introduction of purpose of the Feasibility
Study and description of the study process
 
3  Development Approach
Sets out the corporate business strategy,
sustainability, strategic analysis and exit
strategy pertinent to the study .
3.1
Description of general development approach
proposed by Meridian
 
4  Risk Assessment
Sets out policy, practises, risk assessment,
risk mitigation plan and risk register.
4.1  Policy and practises   
4.2  Risk Assessment   
4.3  Risk Mitigation Plan   
4.4  Risk Register   
5  Health and Safety
Sets out policy, procedures, assessment,
strategy, and management plan in sufficient
detail to support the project's cost estimate
and schedule.
5.1  H&S Policy and procedures   
5.2  H&S Assessment   
5.3  H&S Strategy   
5.4  H&S Management Plan    
6  Environmental
Sets out policy, procedures, assessment,
strategy, and management plan in sufficient
detail to support the project's cost estimate
and schedule.
6.1  Environmental Policy and Procedures   
6.2  Environmental Assessment   
6.3  Environmental Strategy   
6.4  Environmental Management Plan   
6.4.1  Review permits and approvals required   
6.4.2  Develop permits and approvals register   
7
Geology and Mineral Resource
Estimate
Confirmation by Consultant based on
information by the Company
7.1  Data Acquisition   
7.2  Review design of drill program, review results   
7.3  Regional, Local and Property Geology   
7.4  Geological Structure   
7.5  Geology Model   
7.6  Resource Estimate   
8  Mining and Ore Reserve Estimate
Sets out data acquisition, standards, mine
planning, mine configuration, production
schedule, reserve estimate and waste dump
design in sufficient detail to support the
project’s cost estimate and schedule.
8.1  Data Acquisition and Standards   
8.2  Geotechnical Considerations   
8.3  Hydro-geology and Hydrology   
8.4  Mining Method Selection   
8.5  Mine Design and Configuration   
8.6  Waste Dump Design   
8.7  Dewatering Plan   
8.8  Ore Reserve Estimate   
9  Mineral Processing
Sets out data acquisition, process selection &
design, production schedule, materials
handling (ROM ore through to product
transport) and tailings disposal in sufficient
detail to support the project’s cost estimate
and schedule.
9.1  Data Acquisition and Standards   
9.2  Process Selection & Design   
9.3  Process Schedule   
9.4  Materials Handling   
9.5  Tailings Disposal    
10  Water Management
Sets out policy, procedure, assessment and
the project’s water supply and disposal
management plan in sufficient detail to
support the project’s cost estimate and
schedule.
10.1  Policy and Procedures   
10.2  Water Supply Assessment   
10.3  Water Storage and Disposal   
11  Infrastructure and Services
Sets out data acquisition, standards, design,
and site configuration in sufficient detail to
support the project’s cost estimate and
schedule.
11.1  Data Acquisition and Standards   
11.2  Infrastructure Design and Configuration   
11.3  Electrical Power Supply   
11.4  Water Supply   
11.5  Workforce Accommodation   
11.6  Equipment Maintenance Facilities   
11.7  Administration Facilities   
12  Logistics
Sets out policy, procedure, assessment and
logistics plan to support study sections of
infrastructure & services, project execution
and project operation.
12.1  Logistics Policy & Procedures   
12.2  Logistics Assessment   
12.3  Logistics Plan   
12.3.1  Transport of Consumables and Supplies   
12.3.2  Outgoing Transport of Products   
13  Human Resources
Sets out policy and corporate standards for
the project’s organisation and project
personnel sourcing, recruitment, training,
accommodation and remuneration in
sufficient detail to support the study sections
of project execution and project operation.
13.1  HR Policy & Procedures   
13.2  Management Organisation and Structure   
13.3  Workforce Sourcing and Recruitment   
13.4  Workforce Training   
13.5  Workforce Accommodation   
13.6  Workforce Remuneration   
14  Technology & Information Systems
Sets out policy and standards for technology,
IT equipment and information systems in
sufficient detail to support the study sections
of project execution and project operation.
14.1  Technology Policy & Procedures   
14.2  Phone (voice) Communication   
14.3  Internet Communication   
14.4  Computer Systems   
14.5  Management Information System    14.5.1  Production Reporting Systems   
15  Project Execution
Sets out the approach, strategy and
procedures to the Project Execution phase in
sufficient detail to support the project’s cost
estimate and schedule – and is the precursor
to a Project Execution Plan.
15.1  Project Execution Strategy and Approach   
15.2  Project Execution Policy & Procedures   
15.3  Project Execution Plan   
15.4  Project Execution Schedule   
16  Project Operation
Sets out the approach, strategy and
procedures to the Project Operation phase in
sufficient detail to support the project’s cost
estimate and schedule.
16.1  Project Operation Strategy and Approach   
16.2  Project Operation Policy & Procedures   
16.3  Project Operation Plan   
16.4  Project Operation Schedule   
17  Project Closure
Sets out the approach, strategy and
procedures to the Project Closure phase in
sufficient detail to support the project’s cost
estimate and schedule.
17.1  Project Closure Strategy and Approach   
17.2  Project Closure Policy & Procedures   
17.3  Project Closure Plan   
17.4  Project Closure Schedule   
18  External Relations
Sets out policy, procedure, assessment and
management plan in sufficient detail to
support the study sections of project
execution and project operation.
18.1  External Relations Policy & Procedures   
18.2  External Relations Assessment   
18.3  External Relations Management Plan   
19  Capital Costs
Sets out policy and standards for the
project’s capital cost estimation and collates
capital costs of the different study
disciplines/study report sections.
19.1  Policy & Estimation Standards   
19.2  Capital Cost Estimate   
19.2.1  Geology and Exploration   
19.2.2  Mining Equipment and Mine Commissioning   
19.2.3  Processing Plant Construction   
19.2.4  Infrastructure (Power, Water, General)   
19.2.5  Environmental (Permits, Rehab, Closure)   
19.2.6  Transport (to & from site)   
19.2.7  General and Administration   
19.3  Total Capital Estimate and Schedule    
20  Operating Costs
Sets out policy and standards for the
project’s operating cost estimation and
collates operating costs of the different study
disciplines/study report sections.
20.1  Policy & Estimation Standards   
20.2  Operating Cost Estimate   
20.2.1  Geology and Exploration   
20.2.2  Mining   
20.2.3  Processing   
20.2.4  Infrastructure   
20.2.5  Environmental   
20.2.6  Transport   
20.2.7  General and Administration   
20.3  Total Operating Cost Estimate   
21  Marketing
Sets out policy, procedure, assessment and
the project’s marketing plan in sufficient
detail to meet the business strategy and to
support the project’s cost estimate and
schedule.
21.1  Marketing Policy & Procedures   
21.2  Marketing Assessment   
21.3  Product Marketing Plan   
22  Ownership, Legal & Permitting
Sets out ownership, legal agreements, and
permits required to develop, construct and
operate the proposed project.
22.1  Project Ownership   
22.2  Legal Agreements   
22.3  Review Operating Permits and Approvals   
22.4  Develop permits and approvals register   
22.5  Review Native Title Agreement   
22.6
Investigate attitude of Kimberley Lands
Council
 
23  Technical-Economic Modelling
Sets out policy and standards for technical-
economic modelling and presents the  model
employed and the results of such modelling. 
23.1  Policy and Standards   
23.2  Model Structure   
23.3  Model Assumptions   
23.4  Model Construction   
23.5  Model Results    
24  Financial Modelling and Funding
Sets out the funding means proposed for the
project in sufficient detail to support the
financial modelling and contracting strategy
employed.
24.1  Funding Policy   
24.2  Equity Funding   
24.3  Debt Funding   
24.4  Tax Modelling   
24.5  After-Tax Cashflow    
24.6  NPV, IRR and Breakeven Analysis   
25  Status of Studies
Sets out the standard achieved by this study
report and results of peer reviews as
conducted.
25.1  Standards Achieved   
25.2  Peer Reviews   
26  Future Work Plan
Sets out work required post completion of
the study for the next study phase or project
commitment.
   Future Work Required   
   Future Work Plan and Schedule   
   Future Work Approvals Process   
27  Bibliography & Glossary
Listing of published reports and terms as
employed in the study report.
28  Appendices
Appendices in support of the study report
such as drawings, detailed cost estimates,
detailed schedules, technical reports and
data room details for subsequent due
diligence.
 


https://blog.sciencenet.cn/blog-289142-641652.html

上一篇:Zarathustra选译:自我超越(On Self-Overcoming)
下一篇:关于生物演化和量子物理学中全息原理的对话
收藏 IP: 221.3.133.*| 热度|

0

该博文允许注册用户评论 请点击登录 评论 (0 个评论)

IP: 183.63.97.*   闂傚倸鍊烽悞锕傚箖閸洖纾块柟鎯版绾剧粯绻涢幋鏃€鍤嶉柛銉墯閺呮悂鏌ㄩ悤鍌涘 | 闂傚倷娴囧畷鍨叏瀹ュ拋鍚嬮柛鈩冾殢娴硷拷 闂傚倷娴囧畷鍨叏瀹ュ拋鍚嬮柛鈩冾殢娴硷拷 +1 [1]wliming   2016-12-26 23:22
濠电姷鏁告慨鐑姐€傛禒瀣劦妞ゆ巻鍋撻柛鐔锋健閸┾偓妞ゆ巻鍋撶紓宥咃躬楠炲啫螣鐠囪尙绐為柣搴秵閸忔﹢寮搁弽褜娓婚柕鍫濇鐏忕敻鏌涚€n偆娲存俊顐㈠椤撳吋寰勭€n剙骞楅梻渚€鈧偛鑻晶顔尖攽闄囧▍锝囨閹烘せ鈧箓骞掗弮鍌滄闁诲孩顔栭崳顕€宕抽敐澶嬫櫜闁绘劒璀﹂弫鍥煟濡櫣浠涢柛鐘冲浮濮婄粯鎷呴崨濠冨創闁诲孩姘ㄩ崗妯虹暦閻熸壆鏆﹂柛銉戝啰浜伴梻浣芥硶閸犳挻鎱ㄧ€靛摜鐭嗛柛灞剧矌绾惧ジ鎮楅敐搴濈敖濞寸姰鍨荤槐鎾愁吋閸℃﹩妫冮梺鍝勭焿缁绘繂鐣烽幒鎴斿牚闁告洦鍋呴悾顒勬煟鎼淬埄鍟忛柛锝忕到宀h儻顦归柛鈹垮灪缁傛帞鈧綆浜為崝鎾⒑閸涘﹤濮€闁哄懏绻堥幃鎯х暦閸モ晝锛濋梺绋挎湰閻熝囁囬敂鍓х<缂備焦锕╁▓姗€鏌熼獮鍨伈鐎规洘锕㈤崺锟犲礃閿濆棛浜欓梻鍌欑閹碱偊藝娴兼潙鍨傜憸鐗堝笒娴肩娀骞栭幖顓熺窔缂佽妫欓妵鍕箛椤斿吋鐎绘繛瀛樼矌閸嬫挻绌辨繝鍥ч柛銉仢閵忋倖鐓熸い鎺戝€哥敮鍫曟煃缂佹ɑ宕屾鐐差儔閹瑧鍠婂Ο鑽や簷濠碉紕鍋戦崐鏍箰閹绢喖鐒垫い鎺嗗亾缁剧虎鍙冩俊鍫曞煛閸涱喒鎷洪梺鍦瑰ù鐑藉煡婢舵劖鐓涢柛顐亜婢ь噣宕¢柆宥嗙厱婵炴垶锕崝鐔兼煃缂佹ɑ鈷掗柍褜鍓欑粻宥夊磿閸楃倣娑樷枎閹寸姵鍣梻鍌氬€风粈渚€骞夐敓鐘冲仭妞ゆ牜鍋涢崹鍌涖亜閺嶃劎銆掓い鈺傜叀閺岀喖鎮滃鍡樼暥閻庣懓鎲$换鍌炲煘閹达附鍋愰弶鍫亜閸橈繝姊绘担鐟板姢闁稿﹤娼″濠氬Ω閵夈垺顫嶉梺鎯ф禋閸嬪嫰顢旈敓锟�
闂傚倸鍊烽悞锕傚箖閸洖纾块柟鎯版绾剧粯绻涢幋鏃€鍤嶉柛銉墯閺呮悂鏌ㄩ悤鍌涘  闂傚倸鍊烽悞锔锯偓绗涘洤绀冨┑鐘宠壘缁狀垶鏌ㄩ悤鍌涘 婵犵數濮烽。钘壩i崨鏉戠;闁逞屽墴閺屾稓鈧綆鍋呯亸鐢电磼鏉堛劌绗氭い顐e灴瀵粙濡歌閻涖垻绱撻崒娆戝妽闁哄被鍔戦幃娲Ω瑜忛惌娆忣熆鐠哄搫顦柛瀣崌閺佹劖鎯旈垾鎰佹骄闂備焦鐪归崕閬嶅箠濮椻偓瀵鈽夊⿰鍛澑闂佸搫妫滃畷鐢搞€佹繝鍥﹂柟閭﹀厴閸亪鏌涢锝囩畺妞ゃ儲绻堝娲閳轰胶妲i梺鍛娽缚閺咁偆鍒掔拠娴嬫瀻闁规儳顕崢钘夘渻閵堝懐绠伴悗姘卞厴瀹曟洘鎯旈敐鍥╋紲濡炪値鍘界敮鐐靛姬閳ь剟姊烘潪鎵槮缂佸鍩栫粋鎺楁晝閸屾稑娈愰梺鍐叉惈閸燁垶锝為弮鍫熲拺闁煎鍊曞皬闂佺粯甯粻鎾诲箖濞差亜鍗抽柣鎰仛濞堝ジ姊虹粙璺ㄧ伇闁稿鍋ゅ畷鏇熸償閵婏妇鍘甸柣搴㈢⊕宀h法绮诲Ο鑽ょ瘈闁逞屽墯鐎佃偐鈧稒锚娴狀參姊洪崫鍕婵ǜ鍔戣棟闁挎洖鍊归悡鏇㈡煏閸繈顎楁鐐瘁缚缁辨帗娼忛妸銉ь儎缂備胶濮甸惄顖炵嵁濮椻偓閹煎綊顢曢埗鈺佷壕閹兼番鍔嶉埛鎴︽煕濞戞﹫鍔熼柟鏂ュ亾闂備胶枪閿曘儵鎮ч悩宸殨濠电姵纰嶉崑鍕煕韫囨洖甯堕柛鎿冨枛椤啴濡堕崱姗嗘⒖闂佺ǹ顑嗛崝妤冨垝閺冨牆閿ゆ俊銈勮兌閸橆亪姊虹化鏇炲⒉妞ゃ劌鎳橀崺鈧い鎺嗗亾缂傚秴锕畷娲焵椤掍降浜滈柟鐑樺灥閺嬨倝鏌涢悙鑸殿仩缂佽鲸甯¢幃顏堝川椤栨簳鎴濃攽閻愯泛顥嶆い鏇嗗洤鐓濋幖娣灪閸庣喖鏌曟繛鍨姕闁汇倕鍊圭换婵嬫偨闂堟稐绮跺銈忛檮濠㈡ḿ鍙呭┑顔姐仜閸嬫捇鏌曢崱鏇狀槮妞ゆ挸鍚嬪鍕節閸曢潧鏁舵繝鐢靛Х閺佸憡鎱ㄩ弶鎳ㄦ椽鏁冮崒娑欐珫闂佸搫绋侀悘娑樷槈閵忊€充罕闂佺硶鏅炲▍鏇㈠垂閸ф宓侀柛鎰靛枟閸ゅ姊婚崼鐔恒€掔紒鎰仱閹鐛崹顔煎濠碘槅鍋呴悷褍顕ユ繝鍥ㄥ癄濠㈣绻勯幊鎾汇偑娴兼潙绀冮柍鍝勶攻椤ユ牠姊绘笟鈧埀顒傚仜閼活垱鏅舵ィ鍐╃厵闁告垯鍊栫€氾拷
2016-12-27 11:161 婵犵數濮撮惀澶愬级鎼存挸浜炬俊銈呮噹杩濋柣搴秵閸撴岸锝為弴鐔虹闁糕剝蓱鐏忣參鏌i幇顒婅含闁哄矉缍侀獮鍥敆娴e弶鐏嗘繝寰枫倕鐨虹紒顕呭灡缁岃鲸绻濋崶顬冾熆鐠轰警鍎滅紒杈╂暬閺岋絾鎯旈妸锔介敪闂佹椿鍘奸崐鍨嚕椤愩埄鍚嬪璺侯儐濞呫垽姊虹捄銊ユ珢闁瑰嚖鎷� 闂傚倷娴囧畷鍨叏瀹ュ拋鍚嬮柛鈩冾殢娴硷拷 闂傚倷娴囧畷鍨叏瀹ュ拋鍚嬮柛鈩冾殢娴硷拷 +1 | 闂傚倸鍊烽悞锕傚箖閸洖纾块柟鎯版绾剧粯绻涢幋鏃€鍤嶉柛銉墯閺呮悂鏌ㄩ悤鍌涘

1/1 | 闂傚倸鍊峰ù鍥敋閺嶎厼绀堟慨姗嗗劦閿濆绠虫俊銈咃攻閺咃綁姊虹捄銊ユ珢闁瑰嚖鎷�:1 | 濠电姷顣藉Σ鍛村磻閹捐泛绶ゅΔ锝呭暞閸嬪鏌eΟ娆惧殭鏉╂繈姊虹捄銊ユ珢闁瑰嚖鎷� | 濠电姷鏁搁崑鐐哄垂閸洖绠伴柟闂寸劍閺呮繈鏌ㄥ┑鍡樺窛闁告宀搁幃妤€鈽夊▍杈ㄧ矋缁傚秴饪伴崼鐔哄弳闂佺粯娲栭崐鍦偓姘炬嫹 | 濠电姷鏁搁崑鐐哄垂閸洖绠伴柟闂寸贰閺佸嫰鏌涢弴銊ュ箻闁告宀搁幃妤€鈽夊▍杈ㄧ矋缁傚秴饪伴崼鐔哄弳闂佺粯娲栭崐鍦偓姘炬嫹 | 闂傚倸鍊风粈渚€骞栭锔藉亱婵犲﹤鐗嗙壕璇测攽閻樺弶鎼愭潻婵嬫⒑鐠恒劌娅愰柟鍑ゆ嫹 | 闂傚倷娴囧畷鍨叏閹绢喖绠规い鎰堕檮閸嬵亪鏌涢妷顔句汗鐟滅増甯楅弲鎼佹煥閻曞倹瀚�

扫一扫,分享此博文

Archiver|手机版|科学网 ( 京ICP备07017567号-12 )

GMT+8, 2025-1-22 05:09

Powered by ScienceNet.cn

Copyright © 2007-2025 中国科学报社

返回顶部